Frequently asked questions
Mining engineering questions, answered
Every question we answer across the site, in one place: 83 answers on consulting studies and JORC reporting, on-site statutory, planning and production coverage, our Perth training courses, and careers at Go Engineering. Each answer links to the page it belongs to.
Consulting
Studies, reserves, design, scheduling and advice
Mining engineering consultants who set the benchmark
What does a mining engineering consultancy do?
A mining engineering consultancy provides independent technical work across the mine life cycle — mining studies (scoping, pre-feasibility and definitive feasibility), JORC-compliant Mineral Resource and Ore Reserve reporting, mine design, mine planning, life-of-mine scheduling, optimisation, economic analysis and technical due diligence. Go Engineering delivers these services to open pit and underground operations across Western Australia, following the staged study process described in the AusIMM Study Processes Handbook (Monograph 35).
More on Mining engineering consultants who set the benchmark
What is the difference between a scoping study, PFS and DFS?
They are successive stages of confidence. A scoping study is an order-of-magnitude assessment (about minus 25 to plus 50 per cent accuracy) that tests whether a concept warrants further spend; a pre-feasibility study (about minus 15 to plus 25 per cent) compares development options, addresses the JORC modifying factors and is the first stage that can support an Ore Reserve; a definitive feasibility study (about minus 10 to plus 15 per cent) provides the engineered, bankable basis for a final investment decision.
More on Mining engineering consultants who set the benchmark
Are your resource and reserve statements JORC compliant?
Yes. Mineral Resource and Ore Reserve statements are prepared and signed off by Competent Persons under the JORC Code 2012 — members of a recognised professional organisation such as AusIMM with the required experience in the deposit style and mining method — with estimation methodology, classification and modifying factors documented so each statement stands up to peer review, audit and ASX disclosure.
More on Mining engineering consultants who set the benchmark
Do you also provide on-site engineers?
Yes. Alongside consulting, our Contracting arm embeds qualified engineers into operations — statutory coverage by certificated Alternate Underground and Quarry Managers under the WHS (Mines) Regulations 2022, plus planning and production engineering coverage — so study recommendations carry through into operational delivery.
More on Mining engineering consultants who set the benchmark
Mining feasibility studies: from concept to a bankable decision
How long does a mining study take?
Scoping studies typically take weeks to a couple of months, a PFS several months, and a DFS six to eighteen months. Duration is driven by drilling and test-work programs, the number of development options carried, and the engineering definition needed to reach each stage's target accuracy — the staged process described in the AusIMM Study Processes Handbook (Monograph 35).
More on Mining feasibility studies: from concept to a bankable decision
Do I need to complete every study stage?
Not always, but each stage exists to retire risk before larger spend is committed: the scoping study tests the concept, the PFS selects the preferred option and can support a maiden Ore Reserve under the JORC Code 2012, and the DFS provides the engineered definition financiers generally expect before a decision to mine.
More on Mining feasibility studies: from concept to a bankable decision
When should a project move from a scoping study to a PFS?
When the scoping study shows at least one economically attractive development case, the Mineral Resource contains sufficient Indicated material to support potential Ore Reserves, and the remaining uncertainties — metallurgy, geotechnical conditions, permitting, infrastructure — are defined well enough to be studied rather than assumed. Progressing earlier risks spending PFS money studying the wrong option.
More on Mining feasibility studies: from concept to a bankable decision
What accuracy can I expect from each stage?
Scoping is about minus 25 to plus 50 per cent (often quoted as plus or minus 30 to 50 per cent), a PFS about minus 15 to plus 25 per cent, and a DFS about minus 10 to plus 15 per cent. Accuracy tracks engineering definition: factored estimates at scoping, engineered quantities at PFS, and detailed engineering with firm quotations and test work at DFS.
More on Mining feasibility studies: from concept to a bankable decision
Can a study support an Ore Reserve?
Yes. Under the JORC Code 2012, converting Mineral Resources to Ore Reserves requires the modifying factors — mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and government — to be assessed at a minimum of pre-feasibility level. Our studies integrate mine design, scheduling and economic analysis so the Ore Reserve is an output of the study, not an assertion alongside it.
More on Mining feasibility studies: from concept to a bankable decision
Who provides the geology, geotechnical and metallurgical inputs to your studies?
Go Engineering owns the study management, mining engineering and economic workstreams, and leads the multidisciplinary team around them. Where a study requires specialist inputs — resource estimation, geotechnical assessment, metallurgical test work, hydrogeology, environmental and approvals — we coordinate and integrate those workstreams through our trusted network of subject-matter experts, delivering a single integrated study outcome with clear sign-off for each discipline.
More on Mining feasibility studies: from concept to a bankable decision
Scoping studies
What is the difference between a scoping study and a PFS?
A scoping study is an order-of-magnitude technical and economic assessment (typically plus or minus 30 to 50 per cent accuracy) built on factored estimates and a conceptual mine plan. A PFS develops engineered quantities (about minus 15 to plus 25 per cent), compares development options, addresses the JORC modifying factors and can support a maiden Ore Reserve. In short: a scoping study decides whether to keep spending; a PFS decides how.
What is included in a scoping study?
A typical Go Engineering scoping study covers a conceptual mine design and production schedule, factored capital and operating cost estimates, preliminary processing and metallurgical assumptions, an economic model with sensitivities, and a ranked risk register with the recommended work program for the next stage — the concept-level deliverables described in the AusIMM Study Processes Handbook.
Is a scoping study the same as a preliminary economic assessment?
In practice yes. Scoping study, preliminary economic assessment (PEA) and conceptual study all describe the first order-of-magnitude economic evaluation of a Mineral Resource. Under the JORC Code such results must be reported with a cautionary statement making the conceptual nature of the assessment clear.
Can a scoping study be used to declare an Ore Reserve?
No. The JORC Code 2012 requires at least a pre-feasibility study, with the modifying factors assessed, before Mineral Resources can be converted to Ore Reserves — and production targets based solely on Inferred Resources carry strict ASX reporting restrictions.
Pre-feasibility studies (PFS)
Why is a PFS important?
The PFS is the pivot of the staged study process: it compares development options, locks in the preferred configuration, addresses each JORC modifying factor and is the first study level that can support an Ore Reserve. It converts a promising concept into a defined project with engineered quantities and a credible investment case.
What is included in a pre-feasibility study?
A mine design and life-of-mine schedule for the preferred option, processing and infrastructure definition, capital and operating cost estimates built from engineered quantities, economic analysis with sensitivities, assessment of the JORC modifying factors, and an Ore Reserve statement where the work supports one — consistent with the pre-feasibility deliverables in the AusIMM Study Processes Handbook.
What accuracy does a PFS provide?
Capital and operating cost estimates are typically minus 15 to plus 25 per cent, derived from engineered quantities rather than factored allowances — preliminary designs, schedules and equipment selections priced against cost databases and budget quotations.
Does a PFS justify a final investment decision?
Generally not alone. A PFS confirms viability and selects the development option; a DFS then adds detailed engineering, firm quotations and confirmed test work to reduce estimate risk to the minus 10 to plus 15 per cent band that boards and financiers expect for a decision to mine.
Definitive feasibility studies (DFS)
Is a DFS the same as a bankable feasibility study?
In practice yes. DFS and bankable feasibility study (BFS) both describe an investment-grade study with about minus 10 to plus 15 per cent cost accuracy, based on detailed engineering, firm supplier quotations and confirmed metallurgical test work — robust enough for project financiers to lend against.
What accuracy does a DFS provide?
Approximately minus 10 to plus 15 per cent. That band is achieved through detailed engineering design, firm quotations for major equipment and contracts, confirmed geotechnical and metallurgical test work, and an auditable basis of estimate for every major cost item.
What do I get at the end of a DFS?
An auditable study report, bankable capital and operating cost estimates, a robust financial model and valuation, a JORC-compliant Ore Reserve statement, and an implementation plan — the complete technical basis for a final investment decision and project financing.
JORC Resource & Ore Reserve Estimation
What is the difference between a Mineral Resource and an Ore Reserve?
A Mineral Resource is an in-situ concentration of material with reasonable prospects for eventual economic extraction, classified as Inferred, Indicated or Measured by geological confidence. An Ore Reserve is the economically mineable part of a Measured or Indicated Resource, demonstrated by at least a pre-feasibility study with the modifying factors applied. The Reserve is what a mine plan can actually deliver.
How is a Mineral Resource converted into an Ore Reserve?
Conversion applies the JORC modifying factors through mining-study work: mine design with dilution and mining recovery, a production schedule, processing and metallurgical performance, infrastructure, operating and capital costs, and revenue assumptions brought together in an economic model — plus legal, environmental, social and government considerations. Go Engineering delivers this as part of scoping-to-DFS study workflows, so the Ore Reserve is the output of engineering rather than an assertion.
What is JORC (2012)?
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves — prepared by the Joint Ore Reserves Committee of AusIMM, the Australian Institute of Geoscientists and the Minerals Council of Australia, and mandatory for public reporting by ASX-listed companies. Its principles of transparency, materiality and competence underpin every statement we produce.
Who can sign off a resource or reserve statement?
Only a Competent Person under the JORC Code: a member or fellow of AusIMM or the AIG (or an overseas Recognised Professional Organisation) with at least five years of experience relevant to the style of mineralisation, type of deposit and the activity being reported. Our statements are prepared and signed by Competent Persons who meet those requirements.
Mine Design & Infrastructure Consultants
Do you design both open pit and underground mines?
Yes. For open pits we design stages, dumps and haul networks to the geotechnical slope parameters; for underground mines we design declines, level layouts, stope shapes and ventilation and services — including projects transitioning from open pit to underground. Every design is integrated with the schedule and cost model so it is minable and financeable, not just drawable.
How does mine design fit into a study?
Mine design defines the physical basis of a study: design quantities drive the schedule, the capital and operating cost estimates, the economic analysis and ultimately the Ore Reserve. The level of design detail rises with each stage — conceptual at scoping, engineered at pre-feasibility, detailed at definitive feasibility — to match each stage's accuracy target as described in the AusIMM Study Processes Handbook.
What software do you use?
Industry-standard mine planning and design packages, selected to suit the commodity, mining method and the client's environment, with designs reconciled against the geological, geotechnical and scheduling models so the outputs agree with each other.
Life of Mine Planning & Scheduling
What is a life-of-mine schedule?
A life-of-mine (LoM) schedule sequences the extraction of an orebody from first development to closure — balancing grade, development metres, plant capacity and operational constraints to define what is mined, when, at what rate and at what cost. It is the backbone that connects the Ore Reserve to budgets, cash flow and valuation.
Why does scheduling affect project value?
Because discounting makes timing itself valuable. Bringing higher-margin material forward, deferring capital and smoothing production can lift net present value materially without changing the orebody — so we test sequence, cut-off strategy and production rate together, quantifying each alternative in the economic model.
How does LoM scheduling relate to optimisation?
Optimisation defines the best envelope and economic settings — pit shells, cut-off grades, method and scale. LoM scheduling turns that optimised inventory into a practical sequence that honours development, ventilation, geotechnical and equipment constraints. We iterate the two so the value identified in optimisation survives contact with real mining.
Mine Planning Consultants
What does a mine planning consultant do?
A mine planning consultant develops and reviews the plans that turn a mine design into achievable production — short-term (weekly and monthly), medium-term (quarterly to two-year) and long-term (life-of-mine) plans, with the schedules, budgets and reconciliation that keep an operation on plan. Go Engineering provides mine planning consultants to open pit and underground operations across Western Australia.
Do you provide underground mine planning?
Yes — underground mine planning is a core strength. Our engineers have hands-on underground experience across stope design and sequencing, development scheduling, ventilation and services planning, and reconciliation against the life-of-mine plan.
How is mine planning different from life-of-mine scheduling?
Life-of-mine scheduling is the strategic, long-range layer of planning — the whole-of-asset schedule that shapes value. Mine planning is the broader discipline that also covers the medium and short-term plans an operation runs on day to day. We provide both, and they work best when they are aligned.
Can your mine planning engineers work on site?
Yes. Alongside consulting studies and reviews, our Planning Coverage service embeds qualified planning engineers into open pit and underground operations — covering leave, ramp-up or vacancies while keeping your planning cycle on schedule.
Mine Optimisation
What is pit optimisation?
Pit optimisation determines the most valuable open pit outline for a given orebody, cost structure and price deck — commonly using algorithms such as Lerchs–Grossmann — then converts the selected shells into practical pushbacks and phase designs. The outcome is a defensible economic envelope for design, scheduling and Ore Reserve work.
What is cut-off grade optimisation?
Cut-off grade optimisation determines the grade above which material is treated as ore rather than waste, balancing grade, throughput, cost and price over the mine life. Optimising the cut-off strategy dynamically — rather than fixing a single break-even number — frequently lifts net present value with no change to the resource.
Can optimisation help an operating mine, not just a new project?
Yes. Go Engineering undertakes optimisation and value-engineering reviews for operating mines using production and reconciliation analysis, scheduling reviews, equipment productivity assessment and economic evaluation — revisiting cut-offs, sequencing and bottlenecks often unlocks value without major capital.
Mining Project Evaluation & Economic Analysis
What is a discounted cash-flow (DCF) model?
A DCF model projects a project's future cash flows — revenue, operating costs, capital, royalties and taxes — and discounts them to a present value, producing metrics such as NPV, IRR and payback that quantify economic value over time. In our studies the DCF integrates the resource, mine design, schedule and cost estimates, so the financial case is traceable back to its engineering inputs.
Why is sensitivity analysis important?
Mining projects are exposed to uncertain prices, grades, costs and timing. Sensitivity and scenario analysis quantifies how value responds to each input — identifying the variables that matter most, the break-even points, and the risks that need managing before capital is committed.
How does economic analysis fit into a study?
Economic analysis is the integrating workstream of every study stage from scoping to DFS: it draws the resource, design, schedule and cost work together into the financial case that determines whether a project proceeds, and it provides the economic assessment the JORC Code requires among the modifying factors for an Ore Reserve. Where public reporting of valuations is involved, work is framed by the VALMIN Code 2015.
Mining Due Diligence
What is technical due diligence in mining?
Technical due diligence is an independent expert assessment of the technical basis of a mining asset — its Mineral Resources and Ore Reserves, mine plan, schedule, costs, infrastructure and assumptions — to confirm that value and risk are properly understood before a transaction, investment or financing decision.
What standards apply to independent technical review?
Public reporting of technical assessments and valuations of mineral assets in Australasia is governed by the VALMIN Code 2015, alongside the JORC Code 2012 for the underlying Resource and Reserve estimates. Our reviews test whether the asset's reported basis actually complies with those codes — classification, modifying factors, Competent Person sign-off — not just whether the numbers look reasonable.
What is included in a mining due diligence report?
An objective review of the resource and reserve basis, mine design and schedule, cost estimates and assumptions, and infrastructure and permitting status — concluding with a ranked register of technical risks and opportunities and a clear view of the value drivers, so the reader knows exactly what would change the investment case.
Who uses due diligence services?
Acquirers, vendors, lenders, investors and boards — anyone who needs an independent, expert view of a mining asset's technical value and risk before committing capital.
Contracting
Statutory, planning and production coverage on site
On-site mining engineering contractors, when and where you need them
What is mining engineering contracting?
It is experienced mining engineers working on site within your operation — with experienced engineers embedded in your team for roles such as statutory, planning and production coverage. The engineer works under your management while Go Engineering remains accountable for quality.
More on On-site mining engineering contractors, when and where you need them
How is contracting different from consulting?
Contracting embeds our engineers in your team to cover a defined role on site. Consulting delivers independent, deliverable-based technical work such as studies, resource and reserve statements, valuations and due diligence. Contracting is role-based; consulting is project-based.
More on On-site mining engineering contractors, when and where you need them
Do you provide statutory coverage in Western Australia?
Yes. Our Alternate Underground Managers and Alternate Quarry Managers hold First Class Certificates of Competency to provide compliant statutory coverage across WA.
More on On-site mining engineering contractors, when and where you need them
Can you cover short-notice or temporary needs?
Yes — we provide cover for leave, ramp-up, permanent vacancies and short-term surges in demand, matched to your operation.
More on On-site mining engineering contractors, when and where you need them
Statutory Mine Manager Coverage
What is statutory coverage in mining?
Statutory coverage is certificated cover for a mine's key statutory positions — such as underground manager or quarry manager under the Work Health and Safety (Mines) Regulations 2022 (WA) — so the operation stays compliant during leave, ramp-up or a vacancy. Go Engineering provides Alternate Underground Managers and Alternate Quarry Managers to mining and quarrying operations across Western Australia.
What are the Work Health and Safety (Mines) Regulations 2022?
The WHS (Mines) Regulations 2022, made under the Work Health and Safety Act 2020 (WA), are the work health and safety law for Western Australian mining. They replaced the Mines Safety and Inspection Act 1994 and prescribe the key statutory positions every mine must fill — site senior executive, underground manager, quarry manager and exploration manager — along with the certificates of competency each position requires. An alternate appointed to act in a key statutory position must meet the same requirements as the permanent appointee.
What certificates do your statutory engineers hold?
Our engineers hold First Class Mine Manager's and Quarry Manager's Certificates of Competency issued by the Western Australian Board of Examiners, with the statutory examinations the WHS (Mines) Regulations 2022 require for the underground manager and quarry manager positions.
Who can act as an Alternate Underground Manager in WA?
Only someone who meets the same certificate, training and examination requirements as the appointed underground manager. Under the WHS (Mines) Regulations 2022 an alternate is appointed by the mine operator and must be eligible for the key statutory position itself — every Go Engineering alternate holds the required First Class Mine Manager's Certificate of Competency.
Can you provide statutory cover at short notice?
Yes. Our Alternate Underground Managers and Alternate Quarry Managers regularly cover planned leave, unplanned absence, project ramp-up and vacancies across WA, matched to your operation and timing.
Contract Mine Planning Engineers
What planning roles can you cover?
Our engineers cover Planning Engineer, Senior Planning Engineer and Long Term Planning Engineer roles for both open pit and underground operations, covering budgets, schedules and resource forecasts.
Do your planners work on site or remotely?
Primarily embedded on site within your team and systems, with a collaborative approach; remote support can be arranged where appropriate.
How is this different from your consulting LOM scheduling?
Planning coverage places a planning engineer into your operation to run day-to-day and budget planning. Consulting life-of-mine scheduling is an independent, deliverable-based strategic study.
Production Coverage
What production roles can you cover?
Our engineers cover Drill & Blast Engineer, Senior Production Engineer and Project Engineer roles for open pit and underground operations.
Do you cover both open pit and underground?
Yes. Our production engineers have experience across both open pit and underground mining environments.
Can you maintain production through staff turnover?
Yes. Embedding experienced, adaptable engineers is exactly how we help operations maintain production momentum through turnover or demand surges.
Operational Improvement
What is the Senior Mining Engineer Training program?
It is a site-based training and mentoring program, unique in Western Australia, where seasoned mining engineers develop your engineers on the job over a minimum of two work rotations.
How is the program delivered?
On site and hands-on — our mentors observe your engineers at work, provide direct feedback and develop practical skills for immediate improvement, tailored to your operation.
How long does it run?
A minimum of two work rotations, so that learning is embedded through repeated, real-world practice rather than a one-off course.
Training
Our drill and blast, planning, scheduling and ventilation courses
Underground mining training courses in Perth, taught by people who do the work
Who delivers the training?
Practising senior mining engineers from Go Engineering who work on live operations — so the material is current, practical and in line with the latest industry best practice.
More on Underground mining training courses in Perth, taught by people who do the work
Can courses be tailored to our site?
Yes. Every course is scoped to your commodity, mining method and the experience level of your team, and can use your own operational context and examples.
More on Underground mining training courses in Perth, taught by people who do the work
Where are courses run?
In person at our West Perth office, instructor-led by our practising senior engineers.
More on Underground mining training courses in Perth, taught by people who do the work
How is training different from your contracting and consulting?
Contracting places our engineers into your operation; consulting delivers independent studies and reports; training builds the skills of your own people so the capability stays in your team.
More on Underground mining training courses in Perth, taught by people who do the work
Drill & Blast Training Course, Perth
Is the course underground-only?
Yes. The course is underground-focused, covering development and production blasting. If there is enough demand we plan to develop an open pit version in the future.
Is it tailored to our explosives and equipment?
Yes. Examples and exercises can be built around your commodity, ground conditions, explosive products and drilling equipment.
What level is it pitched at?
It can run from fundamentals for graduates through to optimisation for experienced production engineers, scoped to your audience.
Mine Planning Training Course, Perth
Is this open pit or underground?
Both. Core planning principles apply across methods, and content can be weighted to your operation’s context.
Do we need planning software for the course?
No. The course focuses on the engineering and decision-making behind planning; it can be aligned to your software workflows where useful.
How does it relate to scheduling?
Planning sets what and how; scheduling sequences it over time. The two courses are complementary — many teams take both.
Mine Scheduling Training Course, Perth
What’s the difference between planning and scheduling?
Planning decides what and how to mine; scheduling sequences it over time and resources it. This course focuses on the time and sequencing dimension.
Does it cover life-of-mine scheduling?
Yes — from short-term production schedules through to strategic life-of-mine sequencing and how value drives it.
Can it use our operation’s context?
Yes. Exercises can be built around your method, equipment and development rates.
Mine Ventilation Training Course, Perth
Is the course underground-focused?
Yes. Mine ventilation training is centred on underground operations, covering both primary networks and auxiliary ventilation at the face.
Does it cover statutory and compliance aspects?
Yes — airflow requirements, gas and heat management, monitoring and the compliance considerations that drive ventilation design.
Can it be tailored to our mine?
Yes. Content can be aligned to your commodity, depth, diesel fleet and ground conditions.
Careers
Working at Go Engineering
Build your career with mining engineers who set the benchmark
Where are Go Engineering’s roles based?
Contracting roles are on client mine sites across Western Australia, FIFO or site-based on the operation’s roster. Consulting roles are based at our West Perth office.
More on Build your career with mining engineers who set the benchmark
How does mentoring work at Go Engineering?
Engineers are developed through site-based Senior Mining Engineer training and mentoring: practical, on the job and tailored to the individual, held to the Q-PRIO values we hold everyone to.
More on Build your career with mining engineers who set the benchmark
What training do Go Engineering engineers get?
Our senior engineers build and deliver practical courses in drill and blast, mine planning, scheduling and ventilation, and our own engineers learn from the same people.
More on Build your career with mining engineers who set the benchmark
How do I apply if no advertised role matches?
Use the application form and enter ‘Expression of interest’ as the position. Attach your CV and a short note on the work you want, and we will keep you in mind as roles open.
More on Build your career with mining engineers who set the benchmark
Not answered here?
Tell us about the project, the role to cover or the team to train and a mining engineer will reply.